When requesting a circulating fluidized bed (CFB) boiler proposal, send a clear description of the required output, fuel, operating conditions, site, emissions requirements, and project scope. Include the design steam flow in tonnes per hour (t/h), operating pressure in megapascals (MPa), and steam temperature in degrees Celsius (°C), where applicable. Provide fuel analysis and identify the applicable environmental and safety requirements rather than asking a supplier to assume them. The more complete your request, the more useful the supplier’s technical proposal, budget estimate, and list of exclusions can be.
Click here to get more.
At Genjux, we recommend sending an RFQ package that separates confirmed requirements from estimates and open questions. This helps our engineering team identify information gaps early and distinguish a boiler supply request from a broader boiler-island or turnkey project. Use the checklist below to prepare your inquiry.
Start with the boiler’s intended duty and the equipment or process it will serve. State whether you need steam, hot water, or another thermal output, and describe the expected use, such as process heating, power generation, or a combined heat and power system. If the project will replace an existing unit, include its current duty and explain what needs to change.
For steam projects, specify the required continuous and peak flow, pressure, temperature, and steam condition at the delivery point. Clarify whether the stated pressure is gauge or absolute, and identify where the measurement applies, such as the boiler outlet or a downstream battery limit. For hot-water applications, provide supply and return temperatures, flow, and the required system pressure.
Fuel data is central to CFB boiler selection because fuel properties affect heat input, combustion design, ash handling, and emissions control. Identify every planned fuel, its proportion in the blend, expected annual availability, and whether it is a primary, secondary, or backup fuel. If the fuel supply varies by season or source, describe the expected range rather than sending only a single typical analysis.
Provide a recent laboratory analysis where available, including moisture, ash, volatile matter, fixed carbon, calorific value, sulfur, chlorine, and relevant elemental composition. State the basis for each value, such as as-received or dry basis, and include the laboratory date if known. Also report particle-size distribution, bulk density where available, and any known concerns such as high alkalinity, abrasive mineral content, or inconsistent sizing.
Explain how the boiler is expected to run, not only its nameplate duty. Provide annual operating hours, load profile, start-up frequency, required ramping behavior, and any expected periods of low-load operation. If demand changes with production shifts or seasons, share a representative load schedule.
State measurable performance requirements and how you expect them to be evaluated. These may include output capacity, efficiency basis, auxiliary power boundaries, fuel consumption assumptions, and guaranteed operating conditions. Avoid combining targets that use different reference conditions; ask the supplier to state calculation assumptions and identify which values are guarantees and which are estimates.
Provide the site location and relevant environmental design conditions, including ambient temperature range, elevation, humidity, and seismic or wind criteria if they apply to the project. Share available layout drawings, equipment access routes, building limitations, and the space reserved for the boiler and auxiliary systems. If a brownfield installation must connect to existing structures, mark known tie-in points and constraints.
Include available utilities and their limits, such as electrical supply, water quality and flow, instrument air, fuel preparation systems, and wastewater connections. Identify whether the plant has existing fuel storage, conveying, ash collection, water treatment, or flue-gas treatment equipment that may be reused. Clearly distinguish confirmed utility data from preliminary estimates.
Tell the supplier which emissions limits and permitting conditions apply to the project, and identify the jurisdiction and relevant standards where known. List required limits for pollutants such as particulate matter, sulfur oxides, nitrogen oxides, and carbon monoxide, including the reference oxygen level, averaging period, and reporting units when specified by the permit. If the permit is still in development, share draft requirements and note that they are provisional.
Link to Genjux
Specify applicable pressure equipment, electrical, structural, and safety codes, along with any owner engineering standards. Do not assume that a supplier can determine the project’s legal obligations from the site location alone. Your engineering, permitting, and procurement teams should confirm the requirements that govern the installation.
Define what you want the supplier to provide. A boiler-only package may differ substantially from a boiler island that includes fuel feeding, fans, flue-gas treatment, ash systems, controls, and erection support. State whether the RFQ includes engineering, manufacturing, inspection, delivery, installation supervision, commissioning assistance, operator training, or spare parts.
Ask suppliers to identify included equipment, exclusions, interface points, and responsibilities for civil works and site services. For an existing plant, provide connection details for steam, feedwater, fuel, flue gas, electrical power, controls, and ash discharge where available. A clear scope boundary reduces the risk of comparing proposals that cover different equipment or services.
| Information group | What to send | Why it matters |
|---|---|---|
| Output | Duty, flow, pressure, temperature, and delivery point | Defines the required boiler configuration and design conditions |
| Fuel | Analysis, sizing, blend, variability, and supply profile | Informs combustion, feeding, ash, and emissions considerations |
| Operation | Load profile, annual hours, starts, and performance targets | Supports evaluation against actual plant duty |
| Site and compliance | Layout, utilities, ambient conditions, permits, and codes | Identifies installation constraints and required design criteria |
| Commercial scope | Supply boundary, schedule, delivery terms, and services | Makes supplier proposals easier to compare |
Label each item as confirmed, estimated, or to be determined. Attach fuel reports, process flow diagrams, plot plans, utility summaries, and permit documents when available, and give each file a clear revision date. If data is missing, state when it is expected and ask the supplier to list its assumptions in the proposal.
Use a common RFQ template for every bidder and request the same response structure. Ask each supplier to provide a technical data sheet, scope list, exclusions, guaranteed values, design assumptions, and a schedule basis. Compare proposals only after aligning their fuel basis, output conditions, battery limits, and performance definitions.
These omissions do not necessarily prevent an initial budget discussion, but they can make estimates conditional and require later technical clarification. If the project is at an early stage, send the best available information and identify the decisions still pending. Ask the supplier to explain what additional data is needed before a firm technical or commercial proposal can be prepared.
A qualified CFB boiler supplier should be able to review your RFQ, highlight missing or conflicting inputs, and explain how those gaps affect the proposal. Ask for a clear division between preliminary estimates and contractual commitments, along with the design basis used for fuel, output, emissions, and site conditions. For complex or mixed-fuel projects, a technical review before finalizing the specification can help your team resolve assumptions sooner.
Genjux supports B2B buyers by reviewing project requirements and discussing suitable boiler configurations, package scope, and technical interfaces. Send your output requirements, fuel information, operating profile, site data, emissions criteria, and preferred supply boundary for an initial assessment. If some details are not yet available, tell us what is confirmed and what remains under evaluation.
To answer the question directly, send your CFB boiler supplier the required output and operating conditions, complete fuel data, operating profile, site and utility information, emissions and code requirements, and a precise supply scope. Include project schedule expectations and supporting documents, and clearly mark uncertain values. These inputs give suppliers a consistent basis for assessing technical fit and preparing proposals that can be compared fairly.
Your next step is to assemble the available information into a structured RFQ, identify data gaps, and request suppliers to document assumptions and exclusions. Contact Genjux with your project details to begin a technical discussion and determine what additional information is needed for a more complete proposal.